Construction WIP report explained
A work-in-progress report estimates how much of each contract has been earned based on progress, then compares that with what you have billed. It is an accrual-accounting tool, often requested by sureties and lenders. This page walks through one common method with a hypothetical example so you can have a better conversation with your accountant.
CSV file, opens in spreadsheet apps. Contains: Worked example rows with formulas described plus review questions for your accountant. Plain cells, not an automated workbook; enter or recreate calculations using the instructions. Example rows are hypothetical. Free, no login.
Use this when
- A lender, surety or accountant has asked for a WIP schedule.
- Your bank balance looks strong but you suspect you have billed ahead of the work.
- You want to understand overbilling and underbilling before a year-end review.
The cost-to-cost method
Percent complete = cost to date / current estimated total cost. Earned revenue = percent complete x current contract value. Over or under billing = billed to date - earned revenue. A positive number means overbilled (billed ahead of earned); negative means underbilled.
Overbilling means invoices exceed earned revenue; it does not establish that the customer has paid. If collected, those funds may need to cover work still to be done. Underbilling means earned revenue exceeds invoices, not necessarily that an invoiced payment is overdue. Check billing, receipts and cost estimates separately.
Why the estimate drives everything
The method depends entirely on the estimated total cost. If that estimate is too low, percent complete is overstated, earned revenue is overstated and a problem job looks healthier than it is. A WIP report is only as reliable as the cost-to-complete review behind it. That is why the job costing spreadsheet and WIP belong together.
WIP versus cash
Cash-basis dashboards show money in and out. WIP estimates earned revenue regardless of cash. Neither replaces the other. A builder can be overbilled with strong cash, or underbilled with tight cash and solid earned profit. TALON's cash views are cash-based; TALON does not produce accrual WIP schedules.
Worked example
Hypothetical| Job | Contract | Est. total cost | Cost to date | % complete | Earned | Billed | Over (under) |
|---|---|---|---|---|---|---|---|
| Job A | $500,000 | $400,000 | $160,000 | 40% | $200,000 | $230,000 | $30,000 over |
| Job B | $300,000 | $240,000 | $180,000 | 75% | $225,000 | $190,000 | ($35,000) under |
If Job B's true final cost is $270,000, it is really 66.7% complete, earned revenue is $200,000 and the gross profit picture changes. The estimate matters.
Step by step
- List every open contract with current contract value including approved changes.
- Update the estimated total cost for each job from a fresh cost-to-complete review.
- Enter cost to date from your accounting records.
- Calculate percent complete and earned revenue.
- Compare with billed to date to find over or under billing.
- Take the schedule and the checklist questions to your accountant for review.
Common mistakes
- Using stale estimated total costs.
- Treating overbilling as profit or spare cash.
- Including unapproved change orders in contract value.
- Preparing WIP without a qualified accountant's review.
Limits of this resource
- Educational only. Revenue recognition, method choice and presentation depend on your accounting basis and applicable standards; get professional review.
- TALON does not provide an accrual WIP feature. This page is general education.
WIP worked example and accountant checklist
talon-wip-review-checklist.csv
Related resources
Related TALON pages
- P&L in TALON — How TALON shows period financials from manual or QuickBooks data.
- Lender risk analysis — How TALON frames a lender-oriented view of your business.
Connect field work to the books
TALON brings estimates, jobs, schedules and cash into one view for small builders and remodelers.