QuickBooks construction job costing: check before you trust the report

A job profitability report is only as good as the way each transaction was coded. Before you price the next job from last job's numbers, run this read-only check. It does not change anything in your books; it tells you where to look.

CSV file, opens in spreadsheet apps. Contains: Check, where to look, what a problem looks like, finding, transaction reference and follow-up. Plain cells, not an automated workbook; enter or recreate calculations using the instructions. Example rows are hypothetical. Free, no login.

Use this when

  • A job report shows margins that feel too good or too bad.
  • Several people enter bills, receipts and card transactions.
  • You are about to use job history to set prices or targets.

Where job costs usually go missing

Costs disappear from a job report when the transaction was saved without a customer or project, assigned to the wrong one, or posted somewhere the report does not include. Common sources: credit card purchases imported from bank feeds without a job, supplier bills entered in a hurry, payroll or time not allocated to jobs, and journal entries.

QuickBooks Online and QuickBooks Desktop handle projects, jobs and reports differently, and features vary by plan and change over time. Check Intuit's current documentation for your exact product and plan before relying on a specific report or setting.

The diagnostic, step by step

Work through these checks for one completed job first. Note each finding in the CSV with the transaction reference, not customer personal details.

  • Unassigned costs: run an expense or transaction list for the job's date range filtered to cost accounts with no customer or project. Look for supplier names you know were used on the job.
  • Wrong job: scan the job's cost transactions for vendors or materials that do not belong to its scope.
  • Labor: confirm how field labor reaches the job. If payroll is not allocated, the report shows materials and subs only, and margin looks far better than reality.
  • Income side: confirm all invoices for the job, including change orders, are assigned to it, and no other job's invoice is.
  • Timing: compare report basis (cash or accrual) and date range with what you expect. A cash-basis report omits unpaid bills.
  • Items and accounts: check that materials and sub costs post to cost of goods accounts rather than overhead.

Fixing findings safely

Record findings first and decide on corrections with your bookkeeper. Editing reconciled or closed-period transactions can affect filed reports. This checklist intentionally stops at diagnosis.

Step by step

  1. Pick one completed job and note its contract value and date range.
  2. Run the unassigned-cost check and record candidates.
  3. Scan assigned costs for wrong-job items.
  4. Confirm how labor is allocated.
  5. Confirm all income for the job is assigned.
  6. Check report basis and dates.
  7. Review findings with your bookkeeper before any change.

Common mistakes

  • Trusting margin when labor is not allocated.
  • Comparing cash-basis job reports with accrual expectations.
  • Bulk-editing old transactions without bookkeeper review.
  • Assuming Desktop and Online behave the same.

Limits of this resource

  • Read-only diagnostic. It makes no automatic changes and does not describe any TALON integration with QuickBooks Desktop.
  • Product behavior varies by QuickBooks version and plan; verify with current Intuit documentation and your bookkeeper.

Job-coding diagnostic checklist

talon-quickbooks-job-cost-check.csv

Download CSV

Related TALON pages

Connect field work to the books

TALON brings estimates, jobs, schedules and cash into one view for small builders and remodelers.

Back to all 20 resources