All Articles
Financial Planning6 min readFebruary 2026

How to Calculate Breakeven Revenue for Your Construction Business

By TALON Analytics Team

Your breakeven revenue is the minimum monthly revenue your construction business needs to cover all operating expenses. Below this number, you're losing money. Above it, you're profitable. Every hiring decision, equipment purchase, and bid evaluation starts with knowing this number.

The Breakeven Revenue Formula

Breakeven Revenue = Monthly Operating Expenses / Gross Margin Percentage

Two numbers, one division. The rest of this article shows you how to find those two numbers and what to do with the result.

Finding Your Monthly Operating Expenses

Operating expenses (OpEx) are the costs you pay whether or not you have active jobs: office rent, insurance, vehicle payments, office staff salaries, software, utilities, and your own draw. These are not job costs — materials, field labor, and subcontractors come out of your gross margin.

For a contractor doing $3M-$5M annually, monthly OpEx typically falls between $25,000 and $50,000. A $2M company might run $15,000-$25,000. Add up every recurring cost that isn't tied to a specific project.

Calculating Your Gross Margin Percentage

Gross margin is the percentage of revenue left after paying direct job costs (materials, field labor, subcontractors, job-specific equipment).

Gross Margin % = (Revenue - Direct Job Costs) / Revenue

A $400,000 renovation with $260,000 in direct costs has a 35% gross margin. Most contractors operate between 25% and 42% depending on trade and market. Specialty trades like HVAC and electrical tend to run higher margins than general contractors.

Breakeven Revenue in Practice

A remodeling contractor with $35,000/month in operating expenses and a 32% gross margin:

Breakeven = $35,000 / 0.32 = $109,375/month

That's $1.3M in annual revenue just to cover overhead — zero profit. To hit a 10% net margin, they'd need roughly $136,700/month ($1.64M/year).

What Happens When Your Breakeven Revenue Shifts

Here's where this number becomes a decision-making tool. Say that same contractor is considering hiring a project manager at $6,500/month fully loaded. New monthly OpEx becomes $41,500.

New Breakeven = $41,500 / 0.32 = $129,688/month

That's an extra $20,313/month in revenue needed — or roughly $244K/year. Can the PM generate that through better project throughput? If the PM helps close two additional $50K jobs per quarter at 32% margin, that's $128K in annual gross profit, which more than covers the $78K cost. The hire makes sense. Without these numbers, it's a guess.

Breakeven Revenue and Cash Reserves

Your breakeven number also tells you how much cash reserve you need. If breakeven is $109,375/month and you want 3 months of expense coverage, you need at least $328,125 in operational cash. Construction revenue is lumpy — a $300,000 month followed by a $40,000 month is normal. Knowing your breakeven tells you exactly how long you can sustain a dip.

Key Takeaways

- Breakeven Revenue = Monthly OpEx / Gross Margin %

- For a $3M-$5M contractor, breakeven typically falls between $80K-$150K/month

- Every new fixed cost raises your breakeven — model the impact before committing

- Compare breakeven to your trailing 3-month revenue average to gauge financial health

- Cash reserves should cover at least 3x your monthly breakeven

- Automate this with financial analysis tools that calculate breakeven from your trailing data and update it as costs and margins change

See these numbers next to the jobs that drive them

TALON brings breakeven, cash timing, company health and scenarios into the same platform where you run leads, estimates, jobs and schedules. Results depend on the records and assumptions you provide.